Fourth part of the gas pipeline system Lika - Dalmatia, section Drniš - Knin

Investor
ZM-MONTAG d.o.o.

Category
Energy

The separate gas pipeline Drniš - Knin DN300/75 is part of the fourth part of the gas pipeline system of Lika and Dalmatia. Construction works were carried out on the gas pipeline subsection from BS Pakovo Selo to MRS Knin with a length of 33 km, which included: construction of the gas pipeline route in soil of category B and C, including drilling of passages under watercourses and roads (preparation of the working zone, excavation of trenches, production of bedding, procurement and laying of PEHD pipes, backfilling of trenches and final landscaping); construction of above-ground facilities of MRS Drniš, MRS Knin, BS Pakovo Selo and BS Rade (production of reinforced concrete foundations for gas pipelines and accompanying equipment, construction of access roads, paving, construction of asphalt road surfaces and installation of protective fences and container facilities for supervision and management).

Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save