Hydropower plant Rama, Bosnia and Herzegovina

Investor
Elektroprivreda of Bosnia and Herzegovina

Category
Energy

High technology, equipment and materials were applied to the rehabilitation works of the water level hub and the vertical shaft of the Rama hydroelectric power plant.

The rehabilitation of the concrete structure was carried out by installing rod anchors, injecting and sealing special materials. 9,500 m3 of heavy load-bearing scaffolding was built on hard-to-access terrain for workers and machinery. Scaffolding was also built in the shaft itself and working platforms that provided access to the rehabilitation zones.

Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save