In addition to investment maintenance work, we participated in a number of larger projects within the Ledo factory, such as: arrangement and upgrade of the plant, adaptation of the existing production hall and office spaces, construction of the disposal chamber - expedite, arrangement of the storage area and construction of a platform and a transport ramp between the old and new factories. Roads and parking lots were built inside the factory area, and the area was landscaped and equipped with greenery. A watertight sewage system was built, the cold store and fridge service were reconstructed and arranged.