Lukovac wind power plant

Investor
Vjetroelektrana Lukovac d.o.o.

Category
Energy

In the period from January to July 2017, in the municipality of Cista Provo, on the plateau between the ridges of Umac and Jaram - Lukovac at an altitude of 520 to 770 m, the Lukovac wind farm with a power of up to 48 MW was built, which includes 16 wind turbines with plateaus for foundation and technical needs, access roads for the connection of the wind farm with public roads, service roads within the wind farm, internal cable and communication network, transformer station 110/30 kV and connection to the transmission network.

Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save