Marmont bridge, Oštarje

Investor
Hrvatske ceste d.o.o.

Category
Bridges and memorial places

The state of the stone bridge from the beginning of the 19th century on the Mrežnica River required static rehabilitation of the foundation by injecting lime-cement suspensions.

This was followed by the reconstruction and restoration of the arches, pillars and walls of the bridge with large stone blocks. The quality and quantity of the new stone is adapted to the existing original parts, and it is processed with fine bossing. The pavement structure was also renewed.

 

Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save