From July 2012 to March 2013, on the project of the construction of a plant for compression and dehydration of CO2 at CPS Molve III. construction and tradesman works were carried out for the construction of a new substation with a control centre and a new compressor hall, as well as arranged internal roads and the environment of the plant.