Revitalization of the hot water network in the area of ​​the city of Zagreb, Zagreb

Investor
HEP Toplinarstvo d.o.o.

Category
Energy

The project planned the replacement of channel-laid hot water pipelines with ductless pre-insulated hot water pipelines with a total length of 68.5 km and a range of different nominal diameters from DN 20 to DN 800. Theexisting dimensions of the pipelines were retained on the sections planned for revitalization on parts of the route of the existing hot water network CTS of the City of Zagreb. , that is, on parts of hot water mains and distribution networks within the built-up areas of urban settlements of the City of Zagreb: Siget, Sopot, Trnsko, Utrine, Donji grad, Folnegovićevo naselje, Kruge, Vrbik, Savica, Borovje, Sigečica, Gajevo Staglišće, Jarun, Srednjaci, Cvjetno naselje , Trešnjevka and Voltino.

The importance of this project for the City of Zagreb and its residents is best illustrated by the data that HEP Toplinarstvo d.o.o. performs energy activities of production, distribution, and supply of thermal energy in the area of ​​the City of Zagreb and manages a hot water distribution network 227.3 km long.

More than half of the hot water network in the City of Zagreb (56.2%) was built between 1962 and 1995, using the classic method of laying steel pipes in a concrete channel. Such technology is outdated and subject to externalinfluences such as a high level of underground water, possible leakage of water pipes and the penetration of rainwater into concrete channels, which favors the deterioration of pipes and the occurrence of corrosion. The consequence of the previously described problem is the constant growth of heat losses and water replenishment losses, as well as a large number of emergency interventions in the last few years.

The implementation of this project will result in a reduction of heat losses by 27.94%, a reduction of water replenishment losses by 47.36% and a reduction of the number of emergency interventions on the reconstructed sections of the spring by 90% compared to the state before reconstruction. The reduction of heat losses will result in less production of heat energy in power plants, and thus the reduction of emissions of harmful substances into the environment (CO2, NO2, SO2 and PM10), which will have a favorable effect on society.

The project is co-financed by the European Union.

Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save