Wind Farm Bogoslovec, North Macedonia

Investor
THOR d.o.o. EL

Category
Energy

The Wind Farm Bogoslovec, of 36 MW total power was constructed in the municipality of Sveti Nikola, in the Republic of North Macedonia. The company ING-GRAD d.o.o. executed the work on access roads and plateaus, foundations for wind turbines, MV cable line, substation Bogoslovec 30/110 kV and access transmission line 110 kV connecting the substation Bogoslovec with the existing transmission line.

Plateaus for eight wind turbines were realized on concrete piles of 1 meter diameter, of 10 and 12 meters length. The length of executed access roads is 12.5 km, whereas the length of the transmission line with 20 transmission line posts is 4.5 km.

Photography: Urbane ideje d.o.o.

Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save