Wind power plant Korlat, Benkovac

Investor
Vjetroelektrana Korlat d.o.o.

Category
Energy

In June 2019, the company ING-GRAD d.o.o. started the construction of the Korlat wind power plant near Benkovac. The works included: construction of access roads and plateaus, foundations of wind turbines, MV cable untangling, Korlat 30/110 kV substation and access transmission line that connects TS Korlat with the existing transmission line.

Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save