WWTP Osijek, Osijek

Investor
Vodovod Osijek d.o.o.

Category
Infrastructure

The Wastewater Treatment Plant (WWTP) of the city of Osijek is part of the city of Osijek water utility infrastructure improvement project and its objective is the improvement of the water-supply and drainage system and of wastewater treatment in the territory of the city of Osijek and surrounding settlements.

Wastewater from the agglomerations of Osijek and Bilje/Darda, from the area of ​​the city of Osijek and surrounding settlements, covering approximately 135,000 inhabitants, was brought to the device. The derived pollution load is 170,000 ES. The area of ​​this imposing facility is almost 165,000.00 m2, and consists of 28 separate buildings.

The degree of coverage of the waste water drainage system in the agglomeration of Osijek increases from approximately  85% to almost 100% of the population.

 
Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save